This work presents the Unit Commitment (UC) of generation and load dispatch with valve point loading effect. The main objective function is to minimize the operating cost with valve point effect a new approach to evaluate Unit Commitment Problem (UCP) including valve point loading effect is proposed, and it is used to determine the total generation cost for 24 hours schedule with constraints. The effectiveness of the proposed UCP with VPL has been tested in IEEE-30 bus system.